_            _    _        _         _
      /\ \         /\ \ /\ \     /\_\      / /\
      \_\ \       /  \ \\ \ \   / / /     / /  \
      /\__ \     / /\ \ \\ \ \_/ / /     / / /\ \__
     / /_ \ \   / / /\ \ \\ \___/ /     / / /\ \___\
    / / /\ \ \ / / /  \ \_\\ \ \_/      \ \ \ \/___/
   / / /  \/_// / /   / / / \ \ \        \ \ \
  / / /      / / /   / / /   \ \ \   _    \ \ \
 / / /      / / /___/ / /     \ \ \ /_/\__/ / /
/_/ /      / / /____\/ /       \ \_\\ \/___/ /
\_\/       \/_________/         \/_/ \_____\/
trytond-project-revenue 6.2.1
Propagated dependencies: trytond@6.2.10 trytond-company@6.2.0 trytond-product@6.2.0 trytond-project@6.2.0 trytond-timesheet@6.2.0 trytond-timesheet-cost@6.2.0
Channel: guix
Location: gnu/packages/tryton.scm (gnu packages tryton)
Home page: https://docs.tryton.org/projects/modules-project-revenue
Licenses: GPL 3+
Synopsis: Tryton module to add revenue on project
Description:

The Project Revenue Tryton module computes revenue and cost per task and project. The revenue uses the list price of the product. If the product's unit of measure is time based, the revenue is computed as the product of the price and the hours of effort otherwise the price is considered as fixed. The cost is computed by summing the cost of all the linked time sheets and the linked purchase lines.

Total results: 1